TxDOT prepares for Beam Set at State Highway 71 and State Highway 95, Traffic Detour plan in effect.

    • Share:
    October 16, 2017
    Bastrop, Texas, On Monday, October 16th TxDOT Contractor Hunter Industries will set the bridge beams for both the eastbound and westbound overpass structures on State Highway 71 and State Highway 95 as construction moves forward on the overpass project. “The project is progressing very well and we have hit a major milestone in our path to completion,” said William Semora, Jr. Assistant Area Engineer with TxDOT.

    TxDOT will be storing the large concrete beams on the east-bound SH 71 shoulders between the SH 304 and Hasler overpasses and the westbound SH 71 shoulders between the SH 95 and Tahitian Drive overpasses beginning this Sunday, October 15th. “The City of Bastrop greatly appreciates the community’s patience during the construction period of this project,” said City Engineer Wesley Brandon.

    Following the Bastrop High School Homecoming parade, at approximately 8 p.m. on Monday, October 16th State Highway 95, and Jackson Street at State Highway 71 will be closed throughout the night with the crossover reopening by 6 a.m. Tuesday morning. Operations will continue during the day on Tuesday but will not affect State Highway 95 traffic. The inside lane of State High 71 westbound will be closed while the work continues. Motorists will notice additional police presence, construction materials and message boards over the next few days.

    Motorists should be prepared to expect delays during this time frame. “Thankfully this means we are one step closer to the completion of the overpass,” said Brandon.

    City of Bastrop
    1311 Chestnut Street, P.O. Box 427
    Bastrop, TX 78602
    (512) 332-8800

    For more information on the City of Bastrop please visit us online at www.cityofbastrop.org, follow us on social media via Instagram, Facebook or Twitter. Residents can also tune in to BTXN TV via Time Warner Channel 10 and AT&T U-verse Channel 19 or watch online at www.btxn.tv.
    Contact:
    Wesley Brandon, City Engineer
    wbrandon@cityofbastrop.org, (512) 332-8846